2 rack mounting – PLANET GS-5220-16S8C User Manual
Page 31
User’s Manual of GS-5220 Series
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follow the instructions described below.
Step 1:
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step 2:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Figure 2-2-2
shows how to attach brackets to one side of the Managed Switch.
Figure 2-2-2:
Attach Brackets to the Managed Switch.
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step 3:
Secure the brackets tightly.
Step 4:
Follow the same steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack
,
as shown in
Figure 2-2-3
.
Figure 2-2-3:
Mounting Managed Switch in a Rack
31