3 installing the clip on the remote mount board – Avago Technologies MegaRAID SAS 9286CV-8eCC User Manual
Page 11

LSI Corporation
- 11 -
MegaRAID SAS 9286CV-8eCC RAID Controller Quick Installation Guide
June 2012
MegaRAID SAS 9286CV-8eCC RAID Controller Quick Installation Guide
Figure 5 Installing the CVFM03 Module Directly on the RAID Controller
7.
Carefully press the CVFM03 module onto the RAID controller so that the two connectors are firmly joined.
8.
Secure the CVFM03 module to the RAID controller with the screws and the standoffs in the three screw holes.
The standoffs are threaded at both ends, and a screw goes into each end. The screw threads from the back of the
controller board into the board-to-board standoffs on the bottom of the CVFM03 module.
4.2.3
Installing the Clip on the Remote Mount Board
Follow these steps to install the clip directly on the remote mount board (sold separately).
1.
Place the remote mount board on a flat, clean, static-free surface.
2.
Ground yourself, and make sure that the system is grounded.
3.
Remove the clip and the remote mount board module from the package.
4.
Place the clip and the remote mount board module front-side-up on a flat, clean, static-free surface.
5.
Hold the clip so that the screw holes on the clip line up with the screw holes on the remote mount board, as
shown in the following figure.
NOTE Center the screwdriver carefully to avoid stripping the screw heads. Do not over-tighten
the screws.
3_00923-00
CacheVault
Flash Module 03
(CVFM03)
J5B1