Mi-pike-nature-gb, Assembly instructions for the pike/zander rod – Crivit Bottom/Feeder Fishing Reel Combo 300-6 User Manual
Page 3
Assembly instructions
1. The large stationary reel is
assembled on the rod.
2. Check the proper fit and the
secure hold of the reel on the
r o d .
3. Open the bail arm of the reel.
4. Starting from the reel, pull the
line through all line rings of the
r o d .
5. The first stopper is assembled.
6. The bead is threaded.
7. Add a sliding float with a load
bearing capacity of between 20
and 50 g.
8. Thread the sliding lead being
s u fficient for balancing the float
on the main line.
9. Assemble the second stopper.
10. Fasten the large swivel by
means of a half, locked blood
knot at the main line.
11. Check the knot for right fit and by
a tensile test.
12. Push the second stopper (see
point 10) until the half blood knot
of the swivel.
13. Hang a leader with a length of at
least 45 cm with noose and hook
in the open karabiner of the
s w i v e l .
14. Close the karabiner of the
s w i v e l .
15. The stability of the leader must
under no circumstances be
higher than that of the main line.
16. Check the mounting parts of the
leader by means of a tensile test.
17. Close the bail arm of the reel.
18. Adjust the brake of the stationary
r e e l .
19. Have the following accessories
with you:
(a) Mesh landing net/Gaff
(b) Measuring device
(c) Stunning equipment
(d) K n i f e
(e) Unhooker or
unhooking pliers
The fish species that are most often
caught using this fishing method are:
Z a n d e r, pike, sheatfish and large
salmonids (lake trout).
Assembly instructions
for the pike/zander rod
© Reprint and publication in extracts only
with permission of the HoSpo-Verlag,
51674 Wiehl
- GERMANY -
C AU T I O N!
Keep hooks and small parts away
from children and pets. These arti-
cles may only be used under gui-
dance of adults.
GB
Steel leader assembly
Hang the steel leader with triplet
or alternatively with single hooks
in the karabiner of the swivel
and close it.
Stopper assembly
Pass the line through the float rubber
(valve rubber)
Repeat the procedure
Tighten the line
Glass bead
Round sliding
lead
Sliding float assembly
English method
Swivel assembly
Fasten the swivel with a
half, locked blood knot
1. Pass the line
through the eye of
the swivel
2. Lie at
least 5 turns
around the
main line
3. Pass the
end of the line
through the eye
between the swivel
and the turns and
lock it
4. Slightly moisten the
line (tip of the tongue)
and pull it to a knot
The leader must be weaker
than the main line