Installation, Removal from pallet, Pedestal installation - freestanding – Enviro Kodiak 1200 Insert User Manual
Page 22
Installation
Please read and understand these instructions before installing pedestal or ash pan and leg option.
Failure to follow these instructions carefully could cause personal injury or property damage. All screws
are pre-installed on the base of the unit.
R
EMOVAL
F
ROM
P
ALLET
:
• Place the unit on the pallet on its back.
• Slide the pedestal assembly over the bolts
located on the base of the unit using the key-
holed slots provided.
• Tighten all four (4) bolts ensuring the pedestal
is properly aligned to the edges of the unit.
• Stand the unit on the pedestal and set the
unit in the location ready for installation.
• If fresh air supply is being supplied from the
bottom of the unit please install the cover
plate supplied to the rear of the pedestal
covering the 4 inch (10 cm) hole.
Note: In seismically active areas, it is
recommended that your unit is secured to the
floor by using the bolt-down holes inside the
pedestal.
P
EDESTAL
I
NSTALLATION
- F
REESTANDING
:
• Remove the bricks from the unit before starting.
• Remove the two (2) carriage bolts (shown in Figure 15)
that secure the unit to the pallet from inside the firebox.
Note: After the pedestal or legs and ash pan
have been installed but before the bricks are
installed, rivets (Figure 14) must be placed in
the two (2) holes (shown in Figure 15) in the
firebox that carriage bolts came out of. This is
done to make unit burn more efficiently. The
shoulder rivets are found in the manual bag.
Figure 14:
Rivet.
Figure 15: Bolts to remove.
Figure 16: Installing Pedestal.
22