beautypg.com

3 power cables, Figure 32 hot standby configuration, Power cables – Emerson Liebert NX 50 and 60 Hz User Manual

Page 61

background image

UPS Multi-Module Installation

49

3.3.3

Power Cables

The wiring of power cables is similar to that of single module system except that the output of the

upstream UPS is fed into the bypass input of the downstream UPS, and the load is fed by the down-

stream UPS through its inverter or bypass. The bypass and the main input sources must be refer-

enced to the same neutral potential and input earth leakage monitoring devices, if installed, must be

located upstream of the common neutral sinking point. Refer to the instructions in 1.0 - Single Mod-

ule UPS Installation.
No control wires other than those specified for the single module configuration are required.

Figure 32 Hot standby configuration

Mains L1,

L2, L3, N

UPS1

UPS2

Q1

Rectifier

Inverter

Charger

Q2

Q3

Q5

Q2

Q3

Q5

Rectifier

Inverter

Charger

Q1

L1, L2, L3, N

L1, L2, L3, N

Mains L1,

L2, L3, N

Input Distribution

Bypass L1,

L2, L3, N

Bypass L1,

L2, L3, N

UPS1 Output

Upstream

Downstream

This manual is related to the following products: