beautypg.com

Chapter 4, Chapter 4: hardware setup, Hardware setup – Lanner LVC-2000 User Manual

Page 20: Preparing the hardware installation, Hdd installation

background image

20

Hardware Setup

Chapter 4

Embedded and Industrial Computing

Chapter 4:

Hardware Setup

Preparing the Hardware Installation

To access some components and perform certain service

procedures, you must perform the following procedures

first.

WARNING: To reduce the risk of personal injury,

electric shock, or damage to the equipment,

remove the power cord to remove power from

the server. The power switch button does not

completely shut off system power. Portions of the

power supply and some internal circuitry remain

active until power is removed.

1. Unpower the LVC-2000 and remove the power cord.
2. Remove 4 threaded screws from the bottom to take off

the bottom cover.

3. Open the cover.

HDD Installation

The system can accommodate one Serial-ATA disk. Follow

these steps to install a hard disk into the system:
1. Take out the hard disk tray and fix the hard disk on

the tray with 4 mounting screws as illustrated in the

following picture.

2. Plug the Serial-ATA cable to the hard disk.
3. Place the hard disk back to the system’s chassis and fix

it with the mounting screws.

4. Connect the Serial-ATA power and data disk cables to

the Serial-ATA power and disk connectors on the main

board respectively.

1

2

3

4