beautypg.com

Ion Science Hydrosteel 7000 User Manual

Page 28

background image

Hydrosteel 7000 MANUAL

Ion Science Ltd

Page 28 of 43

Unrivalled Detection. www.ionscience.com

Commissioning

23. Join the gland housing together.
24. Check the full assembly has been assembled correctly. If cable gland supplied requires the use of a

sealing epoxy, open the cable gland and follow the fitting instructions supplied with the cable gland.
Apply the sealing compound. The cable gland must be closed before the sealing compound has cured.

25. Once complete, probe connection will be capable of disconnection and reconnection with Hydrosteel

7000. Tighten Han connector screws with flat blade screwdriver to secure the connector.


Additional fixing of conduit if necessary
Use P clips (1/HF-02) and M5 screws or bolts (not supplied) to fix the sample tube conduit to appropriate
refinery structures or cable trunking. Alternatively use cable ties.
Connect conduit to Hydrosteel 7000
Connect the Han connector from the sample tube to the Hydrosteel 7000. Tighten Han connector screws
with flat blade screwdriver to secure the connector.

Terminating power and 4-20mA cable to Hydrosteel 7000
IP67 rated cable connectors are supplied with Hydrosteel 7000 so that the instrument may be quickly
disconnected, and then reinstalled after servicing. These are colour coded using cable ties. Note the
connector pins have been changed to provide key ways and ensure that each connector is individual to the
appropriated panel sock

et. The connectors will fit cable diameter’s 6-12 mm.


Terminate the cables following to the connectors as show by the commissioning diagram overleaf. If any
connection is not made to the Hydrosteel the mating face of the connector must be protected from water
ingress by the fitting protective caps or covering with a plastic bag.