Installation
HY7K probe installation
The probe consists of the AT-S probe the background probe and the Thermocouple probe. The AT-S probe
may be fixed in place using magnets or banding depending on the test site geometry. The background probe
is attached to the AT-S probe using clips. The thermocouple probe is magnetic and may be placed directly
on to the surface of magnetic steels.
AT-S and background probe installation with banding
Components
To affix the probe, you will need two equal lengths of banding appropriate for the target pipe diameter. That
is the pipe circumference plus 30 cm for tool operation and fitting of buckles. Ion Science recommends that
standard 3/8” (9.31 mm) width 0.015” (0.38 mm) gauge Stainless steel banding and buckles be used. This
uses a specialist band-tightening tool. Banding kit may be purchased as an accessory.
Items required are:
AT-S probe collector plate
Back ground probe
Probe clips A-910227
Band tensioning tool
Band cuters
x2 Banding buckles
x2 Banding lengths to suit pipe (3/8” - 0.015” guage)
Wire bush for preparing the metal surface
PPE (personal protective equipment)
Pre-assembly
Best done in a clean environment off-site,
Assemble the background probe on to the AT-S probe using the probe clips.
Prepare the banding by cutting it to length. Equal to the Pipe circumference plus approximately 30
cm. For difficult installations longer lengths may be required with the banding being cut afterwards to
remove the excess.
Fit the buckles to the banding following the manufactures instructions
Fit the banding into the support bracket on the AT-S.
Manually adjust the collector so that it is located at a distance equal to ¼ of the target pipe
circumference from the buckle end of the strap. Loosen or tighten the butterfly nuts as required.
Ensure the collector cap is secured to finger tightness.