Ion Science Hydrosteel 7000 User Manual
Page 22
Hydrosteel 7000 MANUAL
Ion Science Ltd
Page 22 of 43
Unrivalled Detection. www.ionscience.com
Installation
If it has not already been terminated, terminate the thermocouple conduit cable into the gland, bend the
screen wire back and jam it between the insert and the housing. Please see the photographs below.
Connect the thermocouple wires using the terminals inside
the junction box. The thermocouple junction box is mounted
onto the probe bracket so it is fixed in place when the
bracket is fitted to the pipe cladding. A ground connection
should be made from the thermocouple bracket to the local
earth for the purposes of screening. This earth may be
through the contact between probe bracket and cladding.
However if the cladding is electrically isolated or of a non
conductive material an earth connection should be made
directly to a stud on the probe bracket.
Fixing of sample conduit
Use P clips (1/HF-02) and M5 screws or bolts (not
supplied) to fix the conduit to appropriate refinery structures
or cable trunking from the probe bracket towards the
analyser location. Avoid structures which are liable to exceed 100
o
C.