beautypg.com

Repeat steps 2 and 3 for each string – SMA SB 2800i Installation User Manual

Page 21

background image

Installation Guide

Installation

SB2800i-11:SE0504

SMA Regelsysteme GmbH

19

PV string (DC) connection

Connect the PV strings as follows:

1. Check the PV generator connections on their correct polarity

and compliance with the maximum string voltage of 600 V
DC, see chapter 4.2 "Requirements: PV-Modules" (p. 12).

The voltage from the strings is very dangerous!
Be very careful and pay attention to all
applicable safety regulations!

2. Measure the DC voltages between each Multi-Contact plug

connector of a string and ground potential. Follow the safety
instructions!

3. If the voltages you measured is constant and more than a few

volts, a ground fault has occured in this string. The ratios of
voltages approximately indicate where the ground fault can
be found.

When you have found a ground fault in a
string, only connect it to the Sunny Boy 2800i
after you have removed the cause for the
ground fault in the PV generator.

4. Repeat steps 2 and 3 for each string.

5. Connect the trouble-free PV strings to the Sunny Boy. Make

sure to connect them to the correct terminals and with correct
polarization.

When connecting the plus and minus
poles of a string make sure to choose

the correct connection!