9 Technical Data
General
AS-BOX M
Number of phases
1-phase
Nominal voltage
202 ... 253 V
Nominal frequency
45 ... 55 Hz
Number of Sunny Backups
1 x Sunny Backup 5000
Mounting type
suspended
Permitted grid structure
TN-C / TN-S
Load Connection
Nominal output power / current during grid
operation
8 kW / 35 A
Maximum cable cross section
(suitable for connection)
16 mm
2
Fuse (maximum to be used)
D02 (35 A)
Clamping position
Fuse / spring-type terminals
Consumption meter connection
Nominal output power / current
8 kW / 35 A
Maximum cable cross section
(suitable for connection)
16 mm
2
Clamping position
Spring-type terminals
PV system / feed-in meter connection
Nominal output power / current
5.7 kW / 25 A
Maximum cable cross section
(suitable for connection)
6 mm
2
Clamping position
Spring-type terminals
Sunny Backup connection
Nominal output power / current
5 kW / 22 A
Maximum cable cross section
(suitable for connection)
6 mm
2
Fuse
C 32 A
Clamping position
Fuse / spring-type terminals
Generator connection (optional)
Nominal output power / current
8 kW / 35 A
Maximum cable cross section
(suitable for connection)
16 mm
2