2 network port leds – SMA CLUSTER CONTROLLER User Manual
Page 99

18.1.2 Network Port LEDs
LED
Status
Cause and corrective measure
Link/activity
(green)
off
No network connection established.
The Cluster Controller is not connected to the voltage sup-
ply.
Corrective measures:
• Connect the Cluster Controller to the voltage supply
(see the Cluster Controller installation manual).
No network connection established.
The network cable is not correctly connected to the Cluster
Controller, the router or the network switch.
Corrective measures:
• Ensure that the network cables are correctly
connected (see the Cluster Controller installation
manual).
No network connection established.
One or more network components, network cables or con-
nectors are defective or damaged.
Corrective measures:
• Replace the defective or damaged network
components, network cables or connectors.
flashing
Network connection established.
Data is being sent or received.
Speed (yellow)
off
Network connection established.
The data transfer rate is up to 10 Mbit/s.
on
Network connection established.
The data transfer rate is up to 100 Mbit/s.
18 Troubleshooting
SMA Solar Technology AG / SMA America, LLC
User Manual
99
ClusterController-BA-en-14