beautypg.com

4 connecting loads to the battery voltage tap – SMA BATFUSE-B.01 User Manual

Page 16

background image

6  Electrical Connection

SMA Solar Technology AG

16

BatFuse-BE-en-30

Operating Manual

6.4 Connecting Loads to the Battery Voltage Tap

Figure 7: Overview of terminals

Requirements:

☐ Electrical current strength: maximum 8 A
☐ Maximum conductor cross-section: 6 mm²
☐ External diameter of the cable: 9 mm to 16 mm
☐ Material of the conductor: copper

Procedure:

1. Mount the terminal lugs on the DC+ cable and on the DC − cable of the load.
2. On the inverter side, pierce the double-membrane seals with the smaller diameter with a sharp

object from the outside.

3. Lead the cable of the load through the double-membrane seal into the BatFuse and connect it

to terminals L+ and L − on the battery voltage tap (torque: 4.0 Nm to 5.7 Nm).

Position

Designation

A

Terminal L+

B

Terminal L −

This manual is related to the following products: