6  Electrical Connection

Operating Manual

BatFuse-BE-en-30

15

6. On the inverter side, pierce the double-membrane seals with the larger diameter from the

outside with a sharp object.

7. Lead the DC+ cable of the Sunny Island through the double-membrane seal into the BatFuse

and connect it to terminal L+ (torque: 4.0 Nm to 5.7 Nm).

8. Lead the DC − cable of the Sunny Island through the double-membrane seal into the BatFuse

and connect it to terminal L − (torque: 4.0 Nm to 5.7 Nm).

6.3 Connecting the Sunny Island Charger

Figure 6: Overview of terminals

Cable requirements:

☐ Maximum conductor cross-section: 16 mm²
☐ External diameter: 9 mm to 16 mm
☐ Terminal lugs of size M8, maximum width: 16 mm
☐ Material of the conductor: copper

Procedure:

1. Mount the terminal lugs on the DC+ cable and on the DC − cable of the Sunny Island.
2. On the battery side, pierce the double-membrane seals with the smaller diameter with a sharp

object from the outside.

3. Lead the DC+ cable of the Sunny Island Charger

devices through the double-membrane seals into
the BatFuse and connect it to terminal L+
(torque: 4.0 Nm to 5.7 Nm). Always connect two
Sunny Island Charger devices to one terminal.

4. Lead the DC − cable of the Sunny Island Charger

devices through the double-membranes seal into
the BatFuse and connect it to terminal L − (torque: 4.0 Nm to 5.7 Nm). Always connect two
Sunny Island Charger devices to one terminal.

Position

Designation

A

Terminal L+

B

Terminal L −