6  Electrical Connection

Installation Manual

CU600-1000US-IA-en-10

33

6.5 Connecting the PV Array to the Connection Unit 600-US

Cable requirements:

☐ The DC cables of the PV array must be designed in accordance with the installation

requirements applicable on site and for temperatures of +194°F (+90°C).

☐ The DC input and output circuits are isolated from the enclosure and that system grounding, if

required by Section 250 of the National Electrical Code

®

, ANSI/NFPA 70, is the responsibility

of the installer.

☐ The maximum cable length, which is dependent on the conductor cross-section, must be

adhered to.

☐ Cable type: copper wire
☐ Conductor cross-section: AWG 12 to AWG 8 (4 mm² to 8 mm²)

Requirements:

☐ The conduits must be correctly connected to the Connection Unit (see Section 6.3).
☐ The DC switch-disconnector must be switched OFF and the lid must be dismantled.

Procedure:
Connect the DC cables of the PV array to each INPUT A and INPUT B as follows:

3. Lead the DC cables of the PV array through the connected conduits into the interior of the

Connection Unit.

4. Strip the insulation of all cables

23

64

in. (9 mm).

1.

Danger to life due to electric shock

• Make sure that all devices (e.g. inverter) connected to the Connection Unit are switched

off and protected against reconnection (see manual of the respective device).

• Cover the PV modules.

2.

Danger to life due to electric shock
The strings in the Connection Unit are combined to one main string. If there is reverse polarity

of a PV string, there can be short-circuit current flowing when string fuses are inserted, string

safety levers are closed, and the DC switch-disconnector is open.

• Open all safety levers all the way.