beautypg.com

3 mounting the connection unit to a post – SMA 600-US User Manual

Page 25

background image

SMA America, LLC

5  Mounting

Installation Manual

CU600-1000US-IA-en-10

25

5.3 Mounting the Connection Unit to a Post

Additionally required mounting material (not included in the scope of delivery):

☐ 2 screws suitable for the building ground
☐ 2 washers to match the screws
☐ 2 screw anchors suitable for the building ground and the screws.

Procedure:

1. Position the Connection Unit on the post.
2. Mark the drill hole positions by means of the oblong holes in the brackets of the Connection

Unit. Use at least one of the oblong holes at the top and at the bottom.

3. Remove the Connection Unit from the post.
4. Drill holes at the markings.
5. Insert suitable screw anchors into the drill holes.
6. Insert screws with washers through the oblong

holes of the Connection Unit into the drill holes.

7. Tighten the screws. Ensure that no screws are loose.
8. Ensure that the Connection Unit is firmly positioned.

Damage to the Connection Unit due to moisture and dust intrusion
Dust or moisture intrusion can damage the Connection Unit.

• Only mount the Connection Unit with its lid closed and with inserted filler plugs.

This manual is related to the following products: