beautypg.com

Diagram g – ShoreLand'r SLKB150TA User Manual

Page 11

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003957

Page 11

04/10/2008

Diagram G

Locate one of the two 40” brake line tubes. Thread one end of the

line into the remaining port of the tee installed in the previous step.

Route the line back to the second axle. Place a coil in the line to

use up any excess line and then connect the other end of the line

into the hose coming from the second axle. Tighten both fittings.

Thread one end of the second 40” brake line into the remaining

port of the tee installed in the hose from the second axle. Route

the line back to the third axle. Place a coil in the line to use up any

excess line and then connect to the hose coming from the third

axle. Tighten both fittings.

Note that the coil in the line will absorb the vibration created during

towing.

Brakes:

Refer to the BrakeRite brake manual for installation, service and

maintenance.

Tire/Rim Assemblies:

Mount the tire and rim assemblies onto the drum using 1/2” lug hex

nuts and tighten to 110-130 ft./lbs. of torque.