beautypg.com

ShoreLand'r SLR95TAL User Manual

Page 5

background image

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028

www.shorelandr.com

0004307

Page

5

of

16

2/24/2011

Axle:
For installation of the front axle:
From the outside-in, insert a 9/16” X 3-3/4”
stainless steel hex bolt through the spring bracket
and the eye of the spring and secure with a 9/16”
stainless steel hex lock nut with nylon insert.

Raise the rear of the axle and insert the hook end
of the spring into the rocker box and secure with a
9/16” X 3-3/4” stainless steel hex bolt and spring
bushing under the spring and tighten with a 9/16”
stainless steel hex lock nut with nylon insert.

Second Axle Installation for Aluminum trailer with three axles:
Align the eye of the spring on the second axle with the hole provided in the rear of the rocker
bogie. From the outside in, insert
a 9/16” x 3 3/4” hex bolt through
the rocker bogie and the eye of
the spring. Secure with a 9/16”
hex lock nut.

Raise the rear hook end of the
spring and axle assembly up so
it is up inside the rocker bogie.
Secure in place by placing a
9/16” x 3 3/4” hex bolt through
the hole in the rocker bogie just
below the spring leaf. Secure
with a 9/16” lock nut.

This end of rocker/bogie to
toward front of trailer

Second axle spring
attaches here

This manual is related to the following products: