ShoreLand'r SLR95TAL User Manual
Page 5

Midwest Industries, Inc. Ida Grove, IA 51445 800-859-3028
www.shorelandr.com
0004307
Page
5
of
16
2/24/2011
Axle:
For installation of the front axle:
From the outside-in, insert a 9/16” X 3-3/4”
stainless steel hex bolt through the spring bracket
and the eye of the spring and secure with a 9/16”
stainless steel hex lock nut with nylon insert.
Raise the rear of the axle and insert the hook end
of the spring into the rocker box and secure with a
9/16” X 3-3/4” stainless steel hex bolt and spring
bushing under the spring and tighten with a 9/16”
stainless steel hex lock nut with nylon insert.
Second Axle Installation for Aluminum trailer with three axles:
Align the eye of the spring on the second axle with the hole provided in the rear of the rocker
bogie. From the outside in, insert
a 9/16” x 3 3/4” hex bolt through
the rocker bogie and the eye of
the spring. Secure with a 9/16”
hex lock nut.
Raise the rear hook end of the
spring and axle assembly up so
it is up inside the rocker bogie.
Secure in place by placing a
9/16” x 3 3/4” hex bolt through
the hole in the rocker bogie just
below the spring leaf. Secure
with a 9/16” lock nut.
This end of rocker/bogie to
toward front of trailer
Second axle spring
attaches here