beautypg.com

H3C Technologies H3C WX3000E Series Wireless Switches User Manual

Page 56

background image

48

[AC1] nqa schedule admin test start-time now lifetime forever

# Configure track entry 1, and associate it with reaction entry 1 of the NQA test group (with the

administrator admin, and the operation tag test).

[AC1] track 1 nqa entry admin test reaction 1

3.

Configure AC 2:
# Configure a static route to 30.1.1.0/24, with the address of the next hop as 10.2.1.4.

system-view

[AC2] ip route-static 30.1.1.0 24 10.2.1.4

# Configure a static route to 20.1.1.0/24, with the address of the next hop as 10.1.1.1.

[AC2] ip route-static 20.1.1.0 24 10.1.1.1

4.

Configure AC 3:
# Configure a static route to 30.1.1.0/24, with the address of the next hop as 10.4.1.4.

system-view

[AC3] ip route-static 30.1.1.0 24 10.4.1.4

# Configure a static route to 20.1.1.0/24, with the address of the next hop as 10.3.1.1.

[AC3] ip route-static 20.1.1.0 24 10.3.1.1

5.

Configure AC 4:
# Configure a static route to 20.1.1.0/24, with the address of the next hop as 10.2.1.2 and the
default priority 60. This static route is associated with track entry 1.

system-view

[AC4] ip route-static 20.1.1.0 24 10.2.1.2 track 1

# Configure a static route to 20.1.1.0/24, with the address of the next hop as 10.4.1.3 and the
priority 80.

[AC4] ip route-static 20.1.1.0 24 10.4.1.3 preference 80

# Configure a static route to 10.1.1.1, with the address of the next hop as 10.2.1.2.

[AC4] ip route-static 10.1.1.1 24 10.2.1.2

# Create an NQA test group with the administrator admin and the operation tag test.

[AC4] nqa entry admin test

# Configure the test type as ICMP-echo.

[AC4-nqa-admin-test] type icmp-echo

# Configure the destination address of the test as 10.1.1.1 and the next hop address as 10.2.1.2
to check the connectivity of the path from AC 4 to AC 2, and then to AC 1 through NQA.

[AC4-nqa-admin-test-icmp-echo] destination ip 10.1.1.1

[AC4-nqa-admin-test-icmp-echo] next-hop 10.2.1.2

# Configure the test frequency as 100 ms.

[AC4-nqa-admin-test-icmp-echo] frequency 100

# Configure reaction entry 1, specifying that five consecutive probe failures trigger the track
module.

[AC4-nqa-admin-test-icmp-echo] reaction 1 checked-element probe-fail threshold-type

consecutive 5 action-type trigger-only

[AC4-nqa-admin-test-icmp-echo] quit

# Start the NQA test.

[AC4] nqa schedule admin test start-time now lifetime forever

# Configure track entry 1, and associate it with reaction entry 1 of the NQA test group (with the
administrator admin, and the operation tag test).