H3C Technologies H3C S5130 Series Switches User Manual
Page 64
57
examining installation site,
gas saturation,
humidity,
IRF fabric installation site planning,
stop bits (parameter),
switch
attaching mounting bracket to switch chassis,
connecting IRF physical ports,
cooling system,
first time access,
FRUs,
grounding through AC power module PE
grounding with grounding conductor buried in
the earth ground,
grounding with grounding strip,
identifying IRF master switch,
identifying IRF member switch physical ports,
installation,
LEDs,
maintaining the switch,
planning IRF cabling scheme,
,
planning IRF member IDs,
ports,
powering on,
rack-mounting,
setting configuration environment,
setting terminal parameters,
setting up IRF fabric,
technical specifications,
troubleshooting,
troubleshooting the switch,
verifying 19-inch rack installation,
workbench mounting switch,
system administration
troubleshooting configuration terminal
problems,
troubleshooting fixed power module failure,
troubleshooting hot-swappable power module
troubleshooting power module failure,
T
technical specifications,
10/100/1000 Base-T autosensing Ethernet port
LED,
10/100/1000 Base-T Ethernet port,
100/1000Base-X SFP LED,
100/1000Base-X SFP port,
combo interface,
console port,
LED,
port,
port mode LED,
power module status LED,
SFP+ port,
SFP+ port LED,
temperature
installation site requirements,
terminal
troubleshooting garbled terminal display,
troubleshooting no terminal display,
tools needed for installation,
topology
planning IRF cabling scheme,
topology (IRF fabric),
troubleshooting
configuration terminal problems,
fixed power module failure,
hot-swappable power module failure,
power module failure,
switch,
V
verifying
IRF fabric setup,
switch installation (19-inch rack),
VT100,
W