beautypg.com

Tri Tool 765RVC Hyrdaulic Power Supply User Manual

Page 21

background image

21

Model 765 RVC Hydraulic Power Supply

92-0306 : Rev. 140715

Connect the Hydraulic Hoses to the Unit.

The quick disconnects on the hydraulic supply are pre-installed to match the

forward flow line on all TRI TOOL Inc. equipment with the female hose quick

disconnect being the forward or high pressure line.

Connect the hoses to the machine to be used.

Check the level of hydraulic fluid in the reservoir.

There is a minimum of 15 gallons (56.8 liters) required.

For every 100’ (50’ [12.7 m] hose set) of 3/4” (19 mm) diameter hose connect-

ed to the power supply an additional 2.3 gallons (8.7 Lt.) of fluid is required.

Connect the Unit to a Power Source

Check the motor rotation if any main power re-connections have been made since

the initial setup checks.

The unit is wired for 460 volts of power.

The green light on the top of the Phase Detector is ‘lit’ when the phase is

correct.

When the red light is ‘lit’ the phase monitor is tripped, which indicates one of the

following:

Incorrect phasing for counterclockwise rotation.

Low voltage.

The unit will not start if phasing is not correct.

Turn the Speed knob to ‘MIN’.

Turn the ‘FOR/OFF/REV’ knob to ‘OFF’.

Pull up the ‘PULL TO START’ knob.

Push down on the ‘START’ button to start the unit.