beautypg.com

Re –test period – Seaward Test n Tag Printer User Manual

Page 17

background image

16

Set the TnT PRINTER configuration to “K3110”

With the Printer powered on (Green Light illuminated) through its AC
Adaptor, connect the Printer Lead RJ12 connector into the Printer
and the serial connector into the serial port of the tester.

Re –Test Period

As the labels require a Next Test due, re-test period will now need to
be defined at the start of the test. On selecting NEW TEST or entering
CREATE APPLIANCE in MANUAL MODE this screen appears:

Use the cursor keys to select RE-TEST PERIOD and then press the

ENTER key to choose a re-test period.