beautypg.com

Phase rotation – Seaward Power Clamp User Manual

Page 18

background image

17

Phase Rotation

Line 3

Line 2

Line 1

NOTE :

- Connect the supposed three phase of power source as shown
above.
- The test is only available while the system frequency is stable.

Step 1. Set the rotary switch to the "W" position.
Step 2. Using the Navigator key to choose the "

" mode

Step 3. Connect the Red test lead to the supposed phase
Line 1, and the Black test lead to the supposed phase
Line 3.

a. if volt > 1000V, it will display “OLU” and flash; if volt <30V,

it will display “LoU”

b. If the frequency > 65Hz or < 45Hz, it will display “outF”

and flash.

c. If it is normal, then it will display “L1” and flash for about

3 sec.

This manual is related to the following products: