Seaward KD1E User Manual
Page 17
![background image](https://www.manualsdir.com/files/804159/content/doc017.png)
KD1E Range
Operating Instructions
15
9.2.3 Push the brass tip on the proving unit onto the
exposed contact electrode of the potential indicator.
9.2.4 Press the pushbutton on the proving unit. The
neon’s on neon potential indicator models will
illuminate to prove the indicator is operational. The
display on digital tential indicators will indicate a
voltage of greater than 1.1kV.
Warning – Do not touch the earth terminal and
the brass tip on the proving unit simultaneously.
When the push button is pressed 1.3KV is
generated between these points.
9.2.5 On completion of the proving test, release the push
button, disconnect the earth clamp from the knurled
nut and remove the proving unit brass tip from the
exposed metal head of the potential indicator.
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)