Warning – Seaward G2000 User Manual
Page 40

Test Procedure C
Earthed (Class I) Products plus Light-Up test
Light-Up Test
45. Fit appropriate lamps into the product, making sure not to exceed a maximum of 600W loading.
46. Ensure product switches are set to the ON position.
47. Ensure the TEST INHIBIT lamp is not on – if it is, check that the lamp loading is not excessive or disconnect
the product and check for any sources of short circuit in the wiring.
48. Depress the panel mounted SAFETY button and hold it in, then turn the Light-Up Test keyswitch to the ON
position and hold it there. The lamps in the product should light. If not, suspect a faulty lamp. Release the
keyswitch and SAFETY button.
WARNING
ONLY APPLY THE LIGHT-UP TEST ONCE – do not keep flicking the switch on and off as this may cause
nuisance tripping of the supply RCB.
38
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 250 PrimeTest (48 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)