beautypg.com

Scotsman Flaked Ice Machines User Manual

Page 13

background image

Water Seal and Bottom Bearing Installation - covers all 2 inch brass
types

1. Remove old rotating half from the auger.
Clean the mounting area.

2. Place a bead of food grade sealant (such as
Scotsman part number 19-0529-01) onto the
shoulder of the auger where the rotating half of
the water seal will be installed.

3. Wash the new seal in water. While wet, slip it
onto the bottom of the auger, rubber side
toward the auger. Push up until seated against
the sealant. Do not allow any sealant to come
into contact with the face of the seal.

4. Wash the stationary half the water seal with
water. Slip it up into the bottom of the
evaporator until the bottom of the seal is inside
the evaporator about 1/4".

5. Push the bottom bearing against the water
seal until the bottom bearing is inside the evaporator about 1/16".

6. Replace the evaporator on the adapter, and re-attach the stand using the original
bolts.

7. Attach the auger to the top bearing and breaker.

8. Return the auger to the evaporator and slide it down until the splines touch the
coupling.

Note: Pre-align the breaker holes with the evaporator holes to aid in installation.

9. Rotate the auger until the coupling splines align with the auger.

10. Push the auger down, and rotate the breaker until the screw holes line up with the
pilot holes in the evaporator.

11. When the auger is completely seated, reinstall the breaker screws and the bearing
cap.

12. Replace permagum and foam top.

Page 12

Sealant Here

Rubber Side

Smooth Side

This manual is related to the following products: