beautypg.com

Scotsman C0322 User Manual

Page 15

background image

C0322 through C1030

Air and Water Cooled User Manual

November 2012

Page 14

Adjustments

Bridge Thickness - For the Service Tech Only

1. Push and hold Off till the machine stops.

2. Remove evaporator cover.

3. Remove curtain.

4. Use a hex wrench and rotate the bridge thickness

adjustment screw in 1/8 turn increments CW

to increase bridge thickness. Rotate CCW to

decrease bridge thickness.

Caution: Do not make the bridge too thin or the

machine will not harvest properly. Bridge thickness

adjustments are not covered by warranty.

5. Return curtain and evaporator cover to their

normal positions.

6. Push and release the On button. Check next

harvest of ice. Repeat steps 1-6 if needed.

Water Purge Setting

The water purge is factory set to the automatic

position, suitable for most water conditions. The

setting can be changed to one of 5 manual settings or

left on automatic.

Purge setting 1 - Minimum

2 - Moderate 3 - Standard

4 - Heavy

5 - Maximum

A - Automatic

Water Type

RO water or
equivalent

Low TDS
non - RO
water

Use for typical
water

High TDS
water

Very High TDS
water

Any with
conductivity not
less than 10
microSiemens/
cm

To set:

1. Switch the machine OFF by holding the Off button

in until a number or the letter A shows on the

display.

2. Press and release the On button repeatedly until

the number on the display corresponds to the

desired setting.

3. Press and release the Off switch again to return to

the normal control state.

Bridge Thickness Adjustment Mechanism

Note: Water cooled models, the refrigeration system

discharge pressure is factory set at 245 PSIG,

which should yield a freeze cycle discharge water

temperature of about 105-110 degrees F. Adjust if

necessary.

Note: Indentations may be deeper on C0322 and C0330

Ice Bridge Thickness Measurement

Adjustment

Screw

1/8-3/16”

bridge

Too Big

Just Right

Too Small

This manual is related to the following products: