beautypg.com

Scotsman C0322 User Manual

Page 13

background image

C0322 through C1030

Air and Water Cooled User Manual

November 2012

Page 12

Final Check List

After connections,

1. Wash out the bin. If desired, the interior of the bin

could be sanitized.

2. Locate the ice scoop (if supplied) and have it

available for use when needed.

Final Check List:

1. Is the unit located indoors in a controlled

environment?

2. Is the unit located where it can receive adequate

cooling air?

3. Has the correct electrical power been supplied to

the machine?

4. Have all the water supply connections been

made?

5. Have all the drain connections been made?

6. Has the unit been leveled?

7. Have all unpacking materials and tape been

removed?

8. Is the correct switch bezel installed in the trim

strip?

9. Is the water pressure adequate?

10. Have the drain connections been checked for

leaks?

11. Has the bin interior been wiped clean or sanitized?

12. Have any water filter cartridges been replaced?

13. Have all required kits and adapters been properly

installed?

This manual is related to the following products: