INSTALLATION (cont.)

Mounting the CM12 to a Roof Structure

WARNING: Be sure that the supporting roof structure is capable of

supporting the weight of the unit, mounting hardware and the

accessories (Roof structure should be capable to support four

times of total weight or more. Unit weight is 123 lb (56 kg).

Be sure to securely anchor the top ends of the suspension rods. Make sure all nuts

are tight. Be sure to follow all applicable codes.

The CM12 unit is usually mounted above the ceiling and must be securely

mounted to the roof structure. The ceiling support of the existing building may

require reinforcements.

Use field-supplied threaded 1/2 inch suspension rods, washers, nuts and vibration

isolators.

The recommended clearance between ceiling grids and building the structural

member is the unit height plus 3.0 inch (76 mm).

ALL MOUNTING HARDWARE FIELD PROVIDED

Install the four field-supplied rods by

suspending them from suitable

building structure members. Locate

the rods so that they will align with

four mounting holes in the mounting

bracket that are part of the unit

base.

WARNING: Wear gloves to

avoid injury during

installation.

Tightening torque for nuts: 3.02

ft•lbf (4.1 N•m)

CAUTION: Make sure the

unit is level (must be less

than 2° incline).

1/2 in THREADED ROD
(MIN. 123 lb (56 kg) LOAD CAPACITY)

SEE MOUNTING DETAIL

VIBRATION ISOLATOR
(MIN. 123 lb (56 kg) LOAD CAPACITY)

1/2 in THREADED ROD

(MIN. 123 lb (56 kg)

LOAD CAPACITY)

1/2 in NUT

1/2 in WASHER

MOUNTING BRACKET

1/2 in WASHER

1/2 in NUT

1/2 in JAM NUT