Fronius Agilo 75.0 User Manual
Page 71
69
EN
Yield
Amount of money earned during the period in
question (currency can be selected in the Setup
menu)
Like the energy supplied figure, the yield figure may also exhibit discrepancies with other
measured values.
The 'Setup Menu' section explains how to select a currency and charge rate. The factory
setting depends on the respective country setup.
CO
2
Savings
Amount by which CO
2
emissions were reduced
during the period in question (g / kg)
The value for CO
2
savings depends on the power station facilities and corresponds to the
CO
2
emissions that would be released when generating the same amount of energy.
The factory setting is 0.59 kg / kWh (source: DGS – Deutsche Gesellschaft für Sonnene-
nergie e.V. (German Society for Solar Energy)
Max. Output Power
Largest amount of power (W) fed into the gird dur-
ing the period in question
Max. AC Grid Voltage
Highest AC grid voltage (V) measured during the
period in question
Max. PV Array Voltage
Highest PV array voltage (V) measured during the
period in question