beautypg.com

Installation of tx base stand – DH Satellite 60 Heavy Duty Polar/Powered Dec User Manual

Page 5

background image

INSTALLATION OF TX BASE STAND

WE RECOMMEND THAT YOU CHECK WITH A LOCAL ENGINEER TO DETERMINE SOIL TYPE AND

BEARING TO VERIFY THAT THIS BASE WILL WORK FOR YOUR LOCALE. In areas of frost, you must go below

levels or make provisions for frost heave.

The base stand unit is designed to go above ground and/or installed on the concrete pad instead of in

it. You can install this either of two ways: the first is you can request a template of the base stand and then

install J-bolts in the concrete as you are pouring it, or you can wait until you receive the base stand (having

previously poured pad) and drill holes into the concrete using the stand as the template. You must use a type

of Lead Head or Garonite, a Resin Mortar to secure the bolts.

Page 5