beautypg.com

Mechanical installation, Mechanical installation overview, Support structure design – Daktronics AB-1010 User Manual

Page 13: Ure 8, Figure 6: dis, Y configuration -2, Ting example -3

background image

Section 2: Mechanical Installation


Dak

sign

ktronics

r evaluation and approval, or you may void the warranty.

egrity of support structures done by

thers. The customer is responsible to ensure a qualified structural engineer approves the structure and

any additional hardware.


2.1

Mechanical Inst

a

tronics engineering staff must approve any changes that may affect the weather-tightness of the
. If you make any modifications, you must submit detailed drawings of the changes to Da

fo

Daktronics is not responsible for installations or the structural int
o

all tion Overview

lation

te i unique, Daktronics has no single procedure for mounting

ecause every instal

si

s

SunSpot

igns. This section contains general information only and may or may not be appropriate for your

articular installation.

A qualified individual must make all decisions regarding the mounting of this sign.

Read both the mechanical and electrical installation sections of this manual before beginning
any installation procedures.

2.2

Support Structure Design

B
s
p


Support structure design depends on the mounting methods, sign size and weight. The structure design
is critical; only a qualified individual should mount the sign. Sign height and wind loading are also
critical factors. It is the customer’s responsibility to ensure that the structure and mounting hardware
are adequate. Daktronics is not responsible for the installations or the structural integrity of support
structures done by others
.

The installer is responsible to ensure the mounting structure and hardware are capable of
supporting the sign and agrees with local codes.

Before beginning the installation process, verify the following.

·

The mounting structure provides a straight and square frame for the sign.

·

The mounting structure supports the sign without yielding at any unsupported points after
mounting.

·

Clearance: 3

O of unobstructed space is available below the sign for filter removal from the sign. 1

¼

O of unobstructed space is available above the top of the sign.

Correct any deficiencies before installation.

Mechanical Installation

2-1