Scheduling the tests
The test scheduler lets you set the date and
time at which the next impedance test will

be executed, and whether it is to be repeated
at regular intervals thereafter. It also lets
you set the schedule independently for each

amplifier channel, together with the frequency
to be used and the tolerance to be applied.

An impedance measurement outside the
prescribed tolerance will be classified as a Test
Failure, be recorded in the amplifier log and/

or generate an email alert (if set up in Event
Logging).

It is not possible to run tests on more

than one channel within each amplifier
simultaneously, so test times for the channels

in any one amplifier should be carefully

staggered.

To add a test to the scheduler, select a channel
from the drop-down list under

Scheduled

Tests, select the frequency to be used (see

remarks above), and select a tolerance; 30%

is recommended initially. Click the calendar

symbol to open the test scheduling calendar

window.

Select the date on which the next test is to
be run by clicking on it. The months can be
scrolled through with the ‘

|<’ and ‘>|’ buttons

at the top. Next select the time at which
the test is to be run using the

Hours and

Minutes spin boxes.

If the test is to be repeated on a regular basis,
select the repetition rate using the lower set of

date/time spin boxes. Note that test intervals
can be set in increments of one minute up to
several years.

When all the scheduling data has been entered,

click

Apply to close the window. The date

and time at which this particular test will be

next run is displayed. To add the test item to
the schedule, click the ‘

+’ button at the end of

the test item line.

Further tests may be added using the same

procedure. Tests may be added with any or all
of the same settings, or different settings may
be used. A test item may be deleted from the
schedule by clicking its ‘

x’ button. When the

test schedule for the amplifier is complete,

the process should be repeated for the other
amplifiers comprising the system.

Contact Page

Clicking the

Contact Us tab links directly

to the contact page of the Cloud website. This

includes all company contact details, including
a query form. Please make use of this facility

if there are any technical points arising from
your VTX-WM1 installation on which you need

assistance.