beautypg.com

Configuring the load – Cloud Electronics VTX-WM1 User Manual

Page 13

background image

VTX-WM1 Installation Guide v1.2

13

test must be run, to establish a reference
impedance at the frequency to be used. The

upper pane of the Test List page is concerned
with this initialisation.

Configuring the Load
The amplifier must be powered on and each

channel connected correctly to its normal

speaker(s). Select each channel in use from
the drop-down list under

Channel. (If any

channels are in Bridge Mode, select the lower-
numbered channel of the pair.) Select the

frequency to be used for the test from the
drop-down list under

Frequency. If using a

bi-amped (or tri-amped, etc.) speaker system,
the frequency for each channel will need to
chosen to match the relevant driver type. The

frequency selected should be approximately in
the middle of the frequency response range of

the speakers/drivers connected to the channel.

Consideration should be also be taken of any
loudspeaker enclosure resonant frequencies

– these may be particularly evident at low

frequencies, and should be avoided, as their use
will give misleading results.

Click the

Config button. This will generate

a dialogue box warning that a test tone is

about to be fed through the audio system.

Click

OK if you are happy for this to occur.

A progress bar is displayed, and when the
test is complete an impedance value will be
displayed in the

Expected field. To re-check

the expected value, set a

Tolerance value

(30% is recommended initially) and click the

Test button. A second test will be run, and

the results displayed.

The DB Management controls allow the

reference database to be cleared. Select an
action from the list and click Drop to perform
that action over the database.

Reference – drops the currently

selected

reference

Unused Refs – drops all references not
used in scheduled tests

All Tests – Clears all scheduled tests and

references from the database.

The test database for a single module will
hold up to 32 entries including references and
scheduled tests. If this limit is exceeded, clear
any unused references from the database.