Basler Electric RDP-110 User Manual
Page 15
![background image](https://www.manualsdir.com/files/773963/content/doc015.png)
9318100990 Rev H
7
7.
After applying the new labels, insert each label card into the appropriate panel slot. Ensure that
each label card is oriented properly by viewing the custom labels through the label windows of the
front panel.
8.
Move the panel assembly adjacent to the conduit box and reconnect the cables to the two circuit
board connectors.
9.
Secure the front panel to the conduit box with the four Phillips screws removed in step 3.
Maximum torque for these screws is 17 inch-pounds or 2 newton meters.
10.
If desired, verify the function of the reprogrammed indicators before returning the RDP-110 to
service.
RDP-110
1BControls and Indicators
See also other documents in the category Basler Electric Accessories for electrical:
- SMC-250 (6 pages)
- AVC63-2 (2 pages)
- AVC63-2.5 (2 pages)
- AVC63-4D (6 pages)
- AVC63-7 (4 pages)
- AVC63-7F (4 pages)
- AVC Sensing Module (2 pages)
- AVC125-10 (10 pages)
- AVC125-10 (14 pages)
- APR63-5 (6 pages)
- APR63-5X (4 pages)
- DECS-400 (250 pages)
- BE350 (4 pages)
- VR63-4/UL (2 pages)
- VR63-4A/UL (4 pages)
- VR63-4B (2 pages)
- VR63-4C/UL (2 pages)
- BE300PM (4 pages)
- DECS-100 (86 pages)
- DECS-250N Terminals and Connectors (370 pages)
- DECS-250 Mounting (4 pages)
- DECS-250N Mounting (4 pages)
- MVC232 (4 pages)
- MVC112 (8 pages)
- MVC236 (24 pages)
- BE2000E (82 pages)
- MVC300 (16 pages)
- CBS 212A (28 pages)
- MVC301 (16 pages)
- ICRM-15 (4 pages)
- DGC-2020 Troubleshooting (620 pages)
- DGC-2020ES (252 pages)
- DGC-2020HD (404 pages)
- DGC-2020ES Mounting (2 pages)
- DGC-2020HD Modbus Protocol (318 pages)
- BE1-25A (90 pages)
- IDP-800 (70 pages)
- ESD201 (4 pages)
- ESD202 (2 pages)
- IDP-1200 (90 pages)