Loaded generator, Power verification – Basler Electric CBS 212A User Manual
Page 22

16
9270700990 Rev F
Loaded Generator
1.
De-energize the generator field and connect a suitably-sized jumper wire across terminals TB1-1
and 2.
2.
Perform Steps 1 through 4 of the Unloaded Generator sub-section.
3.
Remove the jumper wire from terminals TB1-1 and 2 when calibration verification is complete.
Power Verification
To verify that the CBS 212A will provide the specified boost current during short-circuit operation, refer to
the generator manufacturer’s recommended procedures for generator testing under short-circuit
conditions. If desired, final adjustment of the Output Limit Adjustment control may be made during short-
circuit testing.
Testing
CBS 212A
See also other documents in the category Basler Electric Accessories for electrical:
- SMC-250 (6 pages)
- AVC63-2 (2 pages)
- AVC63-2.5 (2 pages)
- AVC63-4D (6 pages)
- AVC63-7 (4 pages)
- AVC63-7F (4 pages)
- AVC Sensing Module (2 pages)
- AVC125-10 (10 pages)
- AVC125-10 (14 pages)
- APR63-5 (6 pages)
- APR63-5X (4 pages)
- DECS-400 (250 pages)
- BE350 (4 pages)
- VR63-4/UL (2 pages)
- VR63-4A/UL (4 pages)
- VR63-4B (2 pages)
- VR63-4C/UL (2 pages)
- BE300PM (4 pages)
- DECS-100 (86 pages)
- DECS-250N Terminals and Connectors (370 pages)
- DECS-250 Mounting (4 pages)
- DECS-250N Mounting (4 pages)
- MVC232 (4 pages)
- MVC112 (8 pages)
- MVC236 (24 pages)
- BE2000E (82 pages)
- MVC300 (16 pages)
- MVC301 (16 pages)
- ICRM-15 (4 pages)
- DGC-2020 Troubleshooting (620 pages)
- DGC-2020ES (252 pages)
- DGC-2020HD (404 pages)
- DGC-2020ES Mounting (2 pages)
- DGC-2020HD Modbus Protocol (318 pages)
- RDP-110 (26 pages)
- BE1-25A (90 pages)
- IDP-800 (70 pages)
- ESD201 (4 pages)
- ESD202 (2 pages)
- IDP-1200 (90 pages)