beautypg.com

Figure 2-5, Ieee handles, Hardware preparation and installation – Artesyn MVME721x RTM Installation and Use (April 2015) User Manual

Page 34

background image

Hardware Preparation and Installation

MVME721X RTM Installation and Use (6806800M42D)

34

9.

Verify that the RTM is properly seated and secure it to the chassis using the two screws
located adjacent to the IEEE handles.

10.

Connect the appropriate cables to the RTM.

Figure 2-5

IEEE Handles

Captive Screw