CIRCUTOR OPTIM HYB Series User Manual
Page 4

CONTENTS
1.- VERIFICATION UPON RECEPTION .................................................................................................................6
2.1.2. CPC2 PANEL: ZERO SWITCHING CONNECTION CONTROL BY TWO SINGLE-PHASE
3.- INSTALLATION ...............................................................................................................................................15
4.3.- CHECKS ONCE THE CAPACITOR BANK HAS BEEN CONNECTED TO THE MAINS ........................26
5.3.- MAINTENANCE WITH THE CAPACITOR BANK CONNECTED ............................................................30
4
OPTIM HYB Series
Instruction Manual