beautypg.com

Vortech H3 I-5 Hummer - 2006-2008 User Manual

Page 29

background image

P/N: 4GN020-010

©2008 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured

20OCT08 v2.0(4GNv2.0)

21

9. PCV VALVE INSTALLATION

A. Locate the valve cover vent hose attached

between the intake manifold and the rear of

the valve cover.

B. Remove the factory 90° rubber reducer from

the line where it attaches to the valve cover

and discard.

C. Locate the PCV valve assembly

(4GN139-096). See Fig. 9-a

D. Assemble the PCV valve assembly as seen

in figure 9-b

E.

Install the previously assembled PCV valve

assembly and secure using the supplied

hose clamps. See Fig. 9-c

F.

Install the 1/2” plastic hose union (7PP500-

001) into the open end of the factory valve

cover vent hose previously connected to the

factory air inlet assembly. See Fig 9-d

G. Connect the 1/2” diameter 1.25” long hose

provided between the previously installed

hose union and the 1/2” x 90° install in the

90° inlet duct. See Fig 9-d , 9-e

Fig. 9-a

Fig. 9-b

Fig. 9-c

Fig 9-e

Fig. 9-d