Spectrum Controls 2080sc-BAC User Manual
Page 18
2-2
Chapter 2: Installation and Wiring
User’s Manual Pub. 0300274-01 Rev. A.0
1. Position the plug-in module with the terminal block facing the front of
the controller as shown. The 2080sc-BACnet module has a different
front panel setup, but the installation in the controller is the same:
2. Snap the module into the module bay.
3. Using a screwdriver, tighten the supplied, self-tapping screw to torque
specifications.
4. Wire the module using the 6-pin connector as shown:
OR
Connect an RJ-45 Ethernet cable and connector between a personal
computer and the connector on the front of the module.
Set up the tag mapping using the software described in Chapter 3.