beautypg.com

SOR 805QS Pressure Switch-Transmitter User Manual

Page 2

background image

2/8

Form 1547 (10.13) ©SOR Inc.

2nd Step: Make the Electrical Connection

The electrical connection may be installed on an adequately supported rigid conduit

system. Use suitable locknuts (not provided) when mounting the instrument to an
unthreaded (knockout) hole.

Securely connect the conduit pipe or fitting by holding the flats on the electrical

connection while tightening.



Electrical connection may be rigid or flexible conduit.

Unit in Hazardous Locations - Prior to removal from service, make sure that the
work area is declassifi ed. Failure to do so could result in severe personal injury
or substantial property damage.

Additional Install Steps for Dual Seal Units

Failure to follow these additional installation instructions may diminish the “Ingress
Protection” and “NEMA” ratings of the “Dual Seal” instruments. An improper installation
will void the warranty.

SET SCREW

ANNUNCIATION PATH

NAMEPLATE AREA

EXTERNAL GROUND

PROVISION

Vertical Installation

The figure on the right depicts the vertical

installation profile; with the electrical
leads on top. The instrument may be
installed with the electrical leads on the
bottom.

The nameplate (tag) should cover the set

screw (annunciation path). Position the
nameplate slot opposite the set screw;
i.e., the nameplate slot should be located
180° from the set screw.