beautypg.com

Maintenance, 21 access to user interface and main pcb, 22 control box – Glow-worm Flexicom sx User Manual

Page 43: 23 fuse - main pcb - control box, 24 installer interface electrical cartridge

background image

0020107231_04 - 12/14 - Glow-worm

MAINTENANCE

- 43 -

14.21 Access to User interface and Main

PCB

For access, refer to section 14.1.

Hinge down the control box and unclip the rear cover to gain

access.

Remove electrical connections from main PCB noting their

positions for replacement.

Unclip main PCB and remove, see diagram 14.12.

Unclip user interface and remove.

For replacement, see diagram 14.13 and ensure that the user

interface connection cable is refitted.

NOTE: When re-fitting any of the control boards make sure you

support the control box to avoid straining hinges as you push

down and clip back into place.

14.22 Control Box

For access, refer to section 14.1.

Hinge down the control box and unclip the rear cover to gain

access.

Remove relevant electrical connections from main PCB and

grommets from the control box.

IMPORTANT: Support the control box whilst undoing the

hinges.

Remove the hinge securing screws accessed from beneath the

boiler and remove the control box, see diagram 14.14.

14.23 Fuse - Main PCB - Control Box

for access, refer to section 14.21.

The fuse is located at the top left hand corner of the main PCB,

see diagram 14.12.

Diagram 14.12

13003

Diagram 14.13

Diagram 14.14

13004

13001

14.24 Installer Interface Electrical Cartridge

Remove the Installer Interface securing screw accessed from

beneath the boiler.

Carefully pull down the electrical cartridge, disconnect the

cables.