beautypg.com

EXFO IQS-9100 Optical Switch for IQS-500/600 User Manual

Page 25

background image

Getting Started with Your Optical Switch

Optical Switch

19

Inserting and Removing Test Modules

5. Push the module all the way to the back of the slot, until the retaining

screw makes contact with the unit casing.

6. While applying slight pressure to the module, turn the retaining screw

knob (located at the bottom of the panel) clockwise until the knob is
horizontal.

This will secure the module into its “seated” position.

The module is correctly inserted when its front panel is flush with the front
panel of the controller or expansion unit.

When you turn on the controller unit, the startup sequence will
automatically detect your module.

Note: You can insert IQ modules into your controller or expansion unit; the

IQS Manager software will recognize them. However, the IQS-9100 locking
mechanism (retaining screw) will not work for IQ modules.

To remove a module from your controller or expansion unit:
1.
While pulling gently on the knob, turn it counterclockwise until it stops.

The module will slowly be released from the slot.

6