Preparing tractor and 3-point hitch, Note – Bolens 140-990A User Manual
Page 23
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Tractor
Frame
Attaching The 12" Moldboard Plow (Optional) To
The Tractor
Preparing Tractor and 3-Point Hitch
The surface of the plow bottom must be cleaned
so that dirt will slide off the moldboard without
sticking. Wipe the polished surface with a rag
soaked in turpentine, naptha or gasoline. An old
brick or pumice stone can also be used to remove
the protective coating, but usually this is not
necessary if soil is not too wet or sticky.
Attaching the Plow to the Tractor
(See Figure 40.)
1. Place two 4" blocks under both the left front
and left rear wheels of the tractor.
2. Attach the right and left pull rods to the clevis
pins on the plow.
3. The upper hitch bracket on the rear of the trac
tor has two mounting positions. Place the up
per hitch bracket in the two upper holes.
4.
Adjust the length of the clevis screw
assembly to 12 V
2
" long.
NOTE
Refer to inset drawing for correct
way to measure the length of the
clevis screw assembly.
5. Attach the flat end of the clevis screw
assembly to the top hole in the upper hitch
bracket using a clevis pin and cotter hairpin.
23