INSTALLATION CHECK LIST
LOCATION AND SUPPORT
___ 1. The generator is properly located.
___ 2. The generator is properly supported.
___ 3. The generator is properly restrained.
___ 4. The inverter is mounted securely.
COMPARTMENT
___ 1. Compartment construction is proper.
___ 2. Holes/openings are vapor-sealed.
___ 3. Compartment size is correct.
___ 4. Compartment is vapor-sealed.
___ 5. Sound insulation is O.K.
___ 6. Floor cutouts properly completed.
COOLING and VENTILATING AIR
___ 1. Air flow is adequate.
___ 2. Air inlet opening is correct.
___ 3. Compensate for restrictions
___ 4. Installation has been tested
___ 5. Inverter has adequate ventilation.
FUEL SYSTEM
___ 1. Fuel tank complies with code.
___ 2. Fuel system properly installed.
___ 3. Fuel system checked for leaks.
EXHAUST SYSTEM
_1. Complies with code requirements.
_2. Properly and safely installed.
ELECTRICAL CONNECTIONS
___ 1. Comply with code requirements.
___ 2. Inverter properly installed.
___ 3. Wiring meets all standards.
___ 4. All connections are correct.
___ 5. Conduit properly installed and sealed.
___ 6. Generator properly bonded to vehicle.
BATTERY INSTALLATION
___ 1. Recommended battery is installed.
___ 2. Recommended cables are installed.
___ 3. Cables are clean and tight.
___ 4. Cables are properly connected.
___ 5. Proper ventilation is provided.
POST INSTALLATION TESTS
.1. All tests properly completed.
OPTIONS AND ACCESSORIES
Check that remote start/stop panels (if used) are prop
erly installed.
If an hourmeter kit is installed, check that job was done
properly.
If any other options and accessories are installed,
check that they were installed properly.
DATE OF INSTALLATION
NAME OF INSTALLER
SIGNATURE OF INSTALLER
— 34 —