beautypg.com

Carrier 48KHA User Manual

Packaged heating/cooling units

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

H

Carrier Corporation • Syracuse. N Y 13221

Packaged Heating/Cooling Units

Note to Installer: After installation, leave these instructions, Owner’s Manual and Parts

Replacement Guide with equipment owner.

CONTENTS

SAFETY CONSIDERATIONS...........................

GENERAL .........................................................

INSTALLATION.................................................

Step

1

— Rig and Place Unit...........................

• ROOFTOP INSTALLATION
• GROUND LEVEL INSTALLATION
• CLEARANCES
• CONDENSATE DISPOSAL
• VENTING

Step 2 — Make Gas Piping Connections

Step 3 — Make Duct Connections..................

Step

4

— Make Wiring Connections ...

• HIGH-VOLTAGE CONNECTIONS
• SPECIAL PROCEDURES FOR

208-V OPERATION

• LOW-VOLTAGE CONNECTIONS
• HEAT ANTICIPATOR SETTING

START-UP.........................................................

SERVICE............................................................

TROUBLESHOOTING CHARTS ......................

SAFETY CONSIDERATIONS

Page

. 1

.

1,2

. 2-9

. 2

5

6

7

9-18

18-21

22,23

NOTE: Installation of this unit must conform to the
guidelines presented in these Installation Instruc­
tions. Read and beeome familiar with this publica­
tion before starting installation.

Only trained, qualified installers and service

mechanics should install, start-up and service this

equipment. Consult the Owner’s Manual for routine
maintenance. All other operations should be per­
formed by trained service personnel.

• Follow all safety codes.
• Wear safety glasses and work gloves.

Use care in handling, rigging and setting bulky
equipment.
Observe precautions in these instructions and on

equipment tags, stickers and labels.

Fig. 1 — Model 48KHA.KLA

GENERAL

Models 48KHA,KLA packaged gas/ electric units

(Fig. 1) are design certified in accordance with

ANSI Z21.47-1983, ARI Standard 210-81 and ARl
Standard 270-84. The units are design certified by

the American Gas Association (AGA) for use with
natural or propane gases with appropriate eontrols
and orifices. See Table 1 for heating input ratings.

Models 48KHA,KLA units are fully self-contained,

combination

gas-heating/electric-cooling

units

designed for outdoor installation on either a rooftop
or ground-level slab.

These units are equipped with an energy-saving

automatic, intermittent, electric spark ignition
system that does not have a continuously burning
pilot. All units are manufactured with natural gas
controls.

© Carrier Corporation 1984

Form 48KH,KL-9SI

This manual is related to the following products: