Typical installation, Page 2, New frame construction) – Twin City Inline / Cabinet Ventilators - TL Series User Manual
Page 6: Existing frame construction)
MODELS
T400L • T500L • T700L
Page 2
TYPICAL INSTALLATION
MOUNTING
(New Frame Construction)
CEILING
JOIST
(24” centers
shown)
10” ROUND DUCT
MOUNTING
SCREW
Blower factory-shipped
in horizontal
discharge position.
Mounting brackets
factory-shipped in
position for ½”
ceiling material.
MOUNTING
(Existing Frame Construction)
TYPICAL INSTALLATION
WIRING
WIRING
PLATE
WHITE
TO
WHITE
BLACK
TO
BLACK
TOP / BACK
OF HOUSING
120 VAC LINE IN
GROUND TO
WIRING PLATE
10” ROUND
DUCT
FINISHED
CEILING
MATERIAL
CEILING JOIST
(24” centers
shown)
2 X 4 FRAMING
(wide side down)
MOUNTING
BRACKETS
(Attached to
opposite sides
of housing &
upside-down,
so housing is
flush with
finished ceiling)
DUCTING
ROOF CAP
10”
ROUND
ELBOW
10”
ROUND
DUCT
WALL
CAP
NOTE: Make sure the shipping tape is removed from the damper
flap and that damper flap opens and closes freely inside the
ductwork. Use duct tape to make ductwork connections secure and
air-tight.
4½” X 18½”
TO 10” ROUND
TRANSITION
MOUNTING
SCREW
4½” X 18½”
TO 10” ROUND
TRANSITION
4½” X 18½”
TO 10” ROUND
TRANSITION
10” ROUND
DUCT
4½” X 18½”
TO 10” ROUND
TRANSITION
10” ROUND
DUCT
4½” X 18½” TO 10”
ROUND TRANSITION
10”
ROUND
DUCT
Factory-shipped unit installed in new construction.
Factory-shipped unit installed in existing construction.
Two ways to connect ductwork to a factory-shipped unit.
Ventilator can be wired from outside of housing.
Use UL approved connectors to wire per local codes.
(Straight-through blower discharge)