Tii 506F User Manual
Page 2
![background image](/manuals/714027/2/background.png)
3. Wrap the excess drop cable/fiber cable slack
in the clockwise direction and place it into the
base enclosure and under the slack retention
fingers.
4. Use a tie-wrap to hold any spliced connections
and cables to the strain relief pads.
5. Punch a hole through the right grommet and
guide the cable through the exit grommet.
6. Close and secure the cover. Tighten the
security hex screw until it is snug. Be sure not
to over tighten the screw.
Figure 3
Tie-Wrap
Strain
Relief Pad
Base
Slack
Retention
Fingers
Cable Slack
Entry
Grommet
Exit
Grommet
See also other documents in the category Tii Equipment:
- OF025PFNOPNST1 (2 pages)
- IF025PFNOPNST1 (2 pages)
- 210 (2 pages)
- 220 (1 page)
- 231-2 (1 page)
- 68T-2S-4 (1 page)
- 68M-2-1T (1 page)
- 68M-12-1T (1 page)
- 68M-1-1T (1 page)
- 170-06-03 (2 pages)
- 69T (1 page)
- ISB (2 pages)
- ISB-MB (1 page)
- 372S-12LP (1 page)
- 372S-12 (1 page)
- 80-100 (1 page)
- 80-400 (1 page)
- 80-410V-45 (1 page)
- SCT-A (1 page)
- 87 (1 page)
- 95S Series (2 pages)
- 95S Series (3 pages)
- 96-00-1 SERIES (2 pages)
- 96-00-4 SERIES (2 pages)
- 97 (2 pages)
- 97C (1 page)
- 99S SERIES (2 pages)
- 831E (1 page)
- 831W2 (1 page)
- 856E (1 page)
- VIS-4 (2 pages)
- ONT-SS (1 page)
- VIS-2 (2 pages)
- FDT1 Series (2 pages)
- FDT2 Series (2 pages)
- FDH1 (14 pages)
- 169F SERIES (2 pages)
- 506F-03 (2 pages)
- 506F-02-01-04 (2 pages)
- 506F-01-01-01/-02/-03 (2 pages)
- UVS-12 (1 page)
- 761-4T-12 (2 pages)
- VIS-3 (2 pages)
- FET1 Series (2 pages)