TII P/N:

92226901


NOTE: IDC’s accept 22-26 AWG solid wire. Wires
should be aligned to the corresponding holes. Green
wire to the “T” (GRN) labeled wire guide and the Red
wire to the “R” (RED) labeled wire guide.

4.11

Insert wires into wire guides at the same time

until they bottom out.

4.12

While holding wires in wire guides, terminate

rocker with thumb (lower rocker all the way).

4.13

Terminate additional voice pairs to lower right

and upper left rockers as required.

4.14

Terminate the DSL customer wire pair at

upper right locker only.

4.15

Assure all rockers are in the down position

and close customer security cover.










5.0 CUSTOMER TELEPHONE WIRE INTEGRITY
TESTING

5.1 Open customer security cover.
5.2 Insert RJ-11 plug into customer test jack to

isolate telco from customer wiring.

5.3 Lift all rockers to the up position.
5.4 Insert customer telephone wire into rocker wire

guides as shown (see Figure 3).

5.5 Terminate rocker (lower rocker all the way).
5.6 Using an ohmmeter, insert probes into test ports

as shown (see Figure 3), and check for continuity.

5.7 Customer wiring is ok if meter does not indicate a

short circuit.

5.8 Repeat test for all four sets of customer telephone

wires. If the customer telephone wire does not
show a meter reading, then it has a break in it.

5.9

Close customer security cover and inform
customer.











6.0 CENTRAL OFFICE SIGNAL TESTING


6.1 Open customer security cover.
6.2 Using a working telephone, insert telephone RJ-
11 plug into customer test jack (see Figure 4).
6.3 Wait a few seconds, lift receiver, and listen for

tone.

6.4 If tone is not present, then contact central office

service provider.

6.5 If dial tone is present, then a problem exists in the

customer telephone wires.








Figure 2

Figure 3

Figure 4