Tie Down Jet Rail XL User Manual
Page 6

TIE DOWN ENGINEERING
6
www.tiedown.com
9. Assemble Bow Stop
Attach 4 inch spool rollers to the bow stop using two hex head bolts,
5” x 1/2”, two flat steel washers and two 1/2” nyloc nuts. The washers
are used on top of the rollers. (Picture 12)
Slide the bow stop over the upright winch mount tube, rubber rollers
in the “up” position. Using the holes in the bow stop plate next to the
winch mount tube,place a 4 inch x 3/8” bolt and nyloc nut. Tighten bolt
so that the bow stop is about 12 inches below the top of the tube. You
will adjust this later to fit your watercraft.
Parts required for this step.
#
Stk. #
Description
Qty.
8
26612
Bow Stop
1
23
17052
Spool Rollers, 4”
2
30
10938
1/2” x 5-1/2” Hex Head Bolt
2
33
10645
1/2” Nyloc Nut
2
37
10573
1/2” Flat Washers
2
28
BBB3750400
3/8” x 4” Hex Head Bolt
1
34
10627
3/8” Nyloc Nut
1
10. Attach Winch & Winch Mount to Winch Mount Tube
Attach winch mount to winch using three - 3/8” x 1” hex bolts and
nyloc nuts (picture 13). Attach winch mount & winch, to tube as shown
in picture 14, using two - 3/8” x 4” hex head bolts. (Picture 14)
Parts required for this step.
#
Stk. #
Description
Qty.
13
17135
Winch
1
28
BBB3750400
3/8” x 4” Hex Head Bolt
2
34
10627
3/8” Nyloc Nut
2
7
26611
Winch Mount
1
27
10538
3/8” x 1” Hex Head Bolt
3
34
10627
3/8” Nyloc Nut
3
11. Assemble Winch Handle
9
8
33
23
30
37
See “NOTE” on page 8 for this step
Parts required for this step.
#
Stk. #
Description
Qty.
26
84472Z
1/2” U-bolt
1
33
10645
1/2” Nyloc Nut
2
38
44540
Shackle Plate
1
Picture 12
Picture 13
Picture 14
27
34
7
13
12